Gregory Bender

2013 May 18: Finish fork assembly and start on the generator (1.60 hours)

Updated:

First entry|Previous entry|Next entry|Last entry


// //

I ordered a hone this week (Cal-Van Tools 357 Disc Brake and Small Engine Hone). This tool cleaned up the inside of the fork leg nicely in no time at all. Both fork legs are now completely assembled.

I removed the old insulating tape from one of the field coils for the generator. Then, I re-wraped that coil using 3M Glass Cloth Electrical Tape (Scotch 27). I've used this product in the past with great success. Once it again, it worked well.


First entry|Previous entry|Next entry|Last entry